Customization: | Available |
---|---|
After-sales Service: | Online Technical Support |
Warranty: | 50 Years, Roof Tile |
Still deciding? Get samples of US$ 5/Piece
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Raw Materials
|
*Alu-Zinc PPGL Galvalume Steel Plate, sintered Stone Chips ( 20 years no color fading), acrylic Glue
|
Color Options
|
15 popular color options (single/mixing colors); more vibrant beautiful colors can be customized
|
Certifications
|
ISO9001, SONCAP, COC, CO and etc.
|
Effective Size
|
1340mm*420mm/1400mm*420mm
|
Coverage Area
|
1290mm*370mm/1350mm*370mm
|
Thickness
|
0.3mm-0.55mm
|
The Number Of Pavement
|
2.08 - 2.16pcs/sqm
|
Packing
|
450-650 pcs/pallet, 9000-13000pcs/20' ft container loads
|
Main features
|
Easy to install; Lightweight; Economic; Eco-friendly; Anti Corrosion; Extreme weather conditions resistant; noise reduction;
strong wind resistant; waterproofing; anti-frame, rich color options and modern designs... |
It used to be that there were only a couple of types of metal roofing - corrugated metal, which has certainly improved over time but aesthetically has always been limited in options, or the much more costly copper cladding.
5 Reasons You Should Switch to a Stone-Coated Metal Roof
In general, there're 3 main parts of raw material contents:
Brand name: SANGOBUILD
Company title: Hangzhou Singer Building Materials Co.,Ltd / Singer-Ruser (HZ) Building Materials Tech. Co., Ltd.
We are FACTORY, not trading company. Established in 2006.
Main product lines: Stone Coated Metal Roof Tiles ; Fiberglass Asphalt Shingle; PVC / Aluminum Rain Gutter System ; Waterproof Self-adhesive Butyl Tapes
We usually could finish the production within 7 - 15 days after receiving the deposit.